The work on the Bubble continues with the welding of all structural elements
June 27, 2022

The Bubble - All load bearing elements in place

The work on the Bubble continues with the welding of all structural elements.

The load bearing structure ensures the safety of the divers during work in difficult conditions, strong currents and wave motion.

The bubble ensures the safety of the divers during work in difficult conditions